Hwy N (Tratt St.) Closed from Walton Drive to Hwy 106 Until Mid-July

(Jefferson County press release) The Jefferson County Highway Department will be resurfacing CTH “N” from Walton Drive to STH “106.”  The work is scheduled to take place beginning the week of April 19, 2021.  The existing deteriorated asphalt pavement will be pulverized, graded and compacted prior to paving the roadway.

During construction the roadway will be closed to through traffic, but access will be maintained to local residences and businesses, as well as emergency vehicles.  A detour will be posted utilizing Business “”12” (Main Street), STH “59”, CTH “D” and STH “106”.  The road will remain closed until approximately the middle of July, depending on the weather.    

Please use caution within the construction areas and please keep children away from the operations.  If you should have any questions, please feel free to contact the Highway Department at (920) 674-7265.

The image on the home page, “Road Closed Sign” by theglobalpanorama is licensed under CC BY-SA 2.0.

Share This
Posted in ,

Other Recent Posts

UW-W Celebrates 1,800+ Graduates at Spring Commencement

Blowing or Leaving Grass Clippings in the Street is Prohibited

SSM Health Dean Medical Group – Whitewater honored with 2026 BigShot award

Warhawks Fall to Vikings after Extra Inning Walk-Off in Regional Final

County Initiative Reduces Invasive Weeds, Lowers Costs for Roadside Maintenance

Final Boater Safety Course for ’26 Offered

This Week’s City & School District Meetings [Updated]

Why Did The Banner Add an Extra Security Step?

UW-W Baseball Opens NCAA Regional on Home Field with 13-4 Win Over Scots [Updated]

Warhawk Baseball 1-1 on Sat. – CORRECTION TO SUNDAY TIME

Seniors in the Park Presents “Sentimental Value”

#FlashbackFriday with the Historical Society: Downtown c.1880

UW-W Students Recognized in Hired Before Graduation

Gov. Evers Appoints Sara Gehrig-Woodman to the Rock County Circuit Court

UW-W Hosting DIII Baseball Regional Beginning Friday